AD 30

Duration : March 2022 – Present

Assignment name and brief description of main deliverables or output

  • Name: University of Health and Science
  • Outputs: Architectural design package Design Development and Construction Design including engineering works of varied disciplines, authority approval/permits, etc.

Construction Management and Supervision work

Name of Client and Country of Assignment

  • Client: Ministry of Public Health, UHS,

  • Country: Phnom Penh, Cambodia

Project Cost : US$ 32 M.

Role on the Assignment : Architectural Design, Engineering Works, Cost Estimation.

Construction Management and Supervision Work

1 comment

  1. December 21, 2021 at 10:08 pm
    Tim Roth

    Curabitur gravida scelerisque nunc quis semper. Vivamus eu metus quis quam volutpat viverra ac ut odio. Phasellus volutpat tristique consequat. Nunc vitae nisl et magna rhoncus sollicitudin. Vestibulum posuere augue et nisi ultricies, vel condimentum ante consectetur. Ut at tellus a nisi dictum lobortis auctor scelerisque dui.

Leave a comment

Your email address will not be published. Required fields are marked *